Four steps, and we answer for all of them, from our shop to your building.

Superior engineers the system, our shop builds it, your framers set the plates and our crew installs it.

Send us your project

A balcony being installed from a lift

The four steps

  1. Superior engineers itSuperior Decks & Railings designs the system and extrudes the aluminum parts. For your job they produce shop drawings and calculations sealed by an engineer.
  2. Our shop builds itWe cut the railing to size and assemble the picket panels on Superior's own machine. We add the posts and the top rail, then assemble the decks. Everything is boxed and shipped to your site.
  3. Your framers set the platesSuperior supplies the knife plates, and we send them to your framers with the plate layout from Superior's sealed shop drawings. Before we arrive, your framers set the plates and ledgers into the wall structure.
  4. Our crew installs itOn site we join each railing to its deck, lift the balcony into place and fasten it.
A crew installing a balcony from a lift

Why it matters

The people who built your balconies are the ones who hang them. Questions go to one thread, not three companies.